SUBJ: GPS STATUS 25 JUL 90 1. SATELLITES, PLANES AND CLOCKS (CS=CESIUM RB=RUBIDIUM): SLOTS MAY NOT BE FINAL UNTIL AFTER 21-SATELLITE REPHASING A. BLOCK I : PRNS 3, 6, 9, 11, 12, 13 PLANE : SLOT D1, A3, A2, C2, A1, C1 CLOCK : RB, RB, RB, CS, CS, CS B. BLOCK II: PRNS 2, 14, 16, 17, 18, 19, 20 PLANE : SLOT B2, E1, D2, F2, F3, A4, B3 CLOCK : CS, CS, RB, CS, CS, CS, CS 2. CURRENT ADVISORIES (ADV) AND FORECASTS (FCST): INFORMATION IS REPEATED FOR SEVEN DAYS AFTER EVENT CONCLUDES NANU MSG DATE/TIME PRN TYPE SUMMARY 126-90172 211629Z JUN 90 ALLSV FCST TESTING 175/0000-240/0000 139-90193 121330Z JUL 90 PRN6 ADV UNUSABLE 193/1000-193/1100 140-90194 120300Z JUL 90 PRN11 ADV UNUSABLE 194/0159-194/0212 141-90194 131700Z JUL 90 PRN18 FCST UNUSABLE 200/1600-201/1200 142-90198 171356Z JUL 90 PRN18 FCST UNUSABLE 200/1000-201/0400 143-90198 181327Z JUL 90 PRN13 ADV UNUSABLE 198/2046-198/2100 144-90202 211000Z JUL 9O PRN11 ADV UNUSABLE 202/0901-202/0915 145-90205 241000Z JUL 90 PRN13 ADV UNUSABLE 205/0748-205/0805 146-90205 241700Z JUL 90 PRN12 ADV UNUSABLE 205/1350-205/1415 3. REMARKS: A. NANU# 142-90198 CORRECTS NANU# 141-90194 PRN18 OUTAGE TO READ UNUSABLE 200/1000-201/0400. B. IMPLEMENTATION OF STANDARD POSITIONING SERVICE: THE CURRENT GPS CONSTELLATION BEGAN BROADCASTING NAVIGATION MESSAGES AT ACCURACY LEVELS CONSISTENT WITH STANDARD POSITIONING SERVICE ON 25 MAR 90. GPS IS NOT EXPECTED TO BE DECLARED FULLY OPERATIONAL UNTIL 1993. ANY GPS USERS ARE OPERATING AT THEIR OWN RISK. C. NOTICE ADVISORY INFORMATION WILL NOT BE AVAILABLE DIRECTLY FROM THE MASTER CONTROL STATION FOR CIVIL USERS BEGINNING 1 AUG 90. THIS INFORMATION MAY BE OBTAINED FROM THE US COAST GUARD, THE GENERAL DYNAMICS GPS BULLETIN BOARD, AND THE US NAVAL OBSERVATORY. D. SATELLITE REPOSITIONING: THE SATELLITES WHICH BEGAN REPOSITIONING EARLIER THIS YEAR WILL CONTINUE GRADUAL CHANGES TO THEIR ORBITAL POSITIONS UNTIL REPOSITIONING TERMINATE DATES AS SHOWN BELOW: PRN TERMINATE#1 TERMINATE#2 REMARKS 11 31 OCT 90 FINAL MANEUV-ER 3 17 OCT 90 FINAL MANEUVER 13 3 OCT 90 FINAL MANEUVER 18 24 NOV 90 8 DEC 90 24 NOV 90 WILL SLOW THE RATE OF CHANGE 19 31 DEC 90 FINAL MANEUVER 16 20 SEP 90 FINAL MANEUVER 2 1 DEC 90 FINAL MANEUVER 14 10 NOV 90 FINAL MANEUVER E. LIMITED SELECTIVE AVAILABILITY TESTING CONDUCTED DURING THE PERIOD BEGINNING DAY 174 (24 JUN 90) UNTIL DAY 240 (28 AUG 90) SHOULD NOT DEGRADE NAVIGATION ACCURACY BEYOND LEVELS IN EFFECT SINCE THE IMPLEMENTATION OF THE STANDARD POSITIONING SERVICE. HOWEVER, USERS MAY OBSERVE SOME CHANGES IN DAY-TO-DAY POSITIONING AND NAVIGATION ACCURACY AS A RESULT OF THIS TEST. POINT OF CONTACT IS MAJOR WYSOCKI AT USSPACECOM/SPJ3OS, (719)554-2634 OR AUTOVON 692-2634. 4. POINT OF CONTACT: MAJ FAUVER AT (719)550-6379.